We elevated the overhang outriggers so we could place some of the rigid insulation below the members and reduce the thermal bridging at the roof.  Our design calls for 6" of rigid polyiso insulation.


 
One more layer and we are ready for the top layer of sheathing.  When we are finished it will function like a SIPS panel on top of the studio.
 
 
We were able to get the final layer of sheathing and ice and water shield installed before the snow set in.  It will be a couple of weeks before the metal roof arrives so we covered everything with 10 mil poly for protection.
 
 
 
 
 