A brief history continued....
After cleaning out the interior we began removing and rebuilding the damaged areas. The existing bathroom was rotten. The floor joists had been destroyed by water and were now infested with termites. The girder and rim joist along the exterior wall also need replacing. We stabilized the exterior wall and replaced everything. This same scenario occurred in the back of the house where the hot water heater was kept.
No comments:
Post a Comment