Once the roof was in place we started removing the flooring in the new 'core' area of the house. This 'core' would include the wet areas, vertical circulation and would be finished with slate tiles. The remaining pine floors were kept in tact and replaced as needed with the our salvaged boards. This turned out to be a lot of work but was well worth it in the end. While the floor was open we added insulation, 60 mil poly and cleaned up the crawl space. We were almost ready to start framing!