Saturday, December 27, 2008




Happy Holiday's to all.
The following is a brief history of the project which started several years ago.
At the time of closing the house was uninhabitable and needed quite a bit of work. We found significant damage from water,termites and what appeared to be smoke/fire damage in some of the roof framing members. A quick check with a level showed some of the walls out of plumb but the floor was relatively level. A structural engineer surveyed the house and indicated that the foundation was solid would support the work we were proposing. We had little information on the septic tank but it appeared to be working based on a survey of the drain field. We closed on the house with an additional construction loan and set to work. All the infrastructure in the house would have to be replaced.